Parc Tecnològic del Vallès
Year: 1998
Duration: 120 days
Location: Parque tecnológico del Vallés
Arquitect: CM&A
Project type: Office building 2000 m2
Backround: Company developing AI solutions, with offices open 24h a day and flexible timetable. They were looking for technologically advanced, economic and fast solution.
Execution: Engineering, design, manufacturing and construction. Mixed structure made of light steel in load-bearing walls, facades and roof, and forging alveolar concrete slabs.
Peculiarities: indoor pool